• Subscribe Here

  • Categories

  • Archives

  • Donate Here

  • Construction Blogs - BlogCatalog Blog Directory
  • Archive for September, 2009

    Brandy at day 60

    Wednesday, September 30th, 2009

    This post follows “Brandy swamp juice at day 29.”  To see that post, click here.

    Brandy Day 60 001On July 29, 2009, I forged ahead with an experiment, of sorts.  I had never tried to make brandy, but had a lot of fruit falling off the tree and decided to go online and get a recipe.  The recipe I found involved filling a glass gallon jar with fruit, adding three cups of sugar and approximately 26 ounces of cheap vodka.  The instructions said to turn the jar of brandy daily, from right side up to upside down for three months.  And so I have.

    (more…)

    Slipforming, part 8 – Successes and failures

    Tuesday, September 29th, 2009

    This post follows “Slipforming, part 7 – Murphy’s Law, a constant companion.”  For a complete list of links to all slipforming posts on this blog, click here.

    Photo album house pictures - old 013Any time one tries something brand new, it is unreasonable to expect only glowing success, but I did anyway.  Bolstered by the fact that I had read every article I could lay my hands upon, I was, after all, an expert.  (Heavy sarcasm here.)  Of course, the laws of the universe always have some humility lessons to offer.  And my rock laying was no different. 

    I had (mostly) overcome doubt, hand pain, gravel quarry funny-men loading my truck to near un-drive-ability, and the lack of bathrooms.  I had successfully built some outstanding forms, and even layed my first rocks in cement.  The problem?  Well, I really had no idea how close to set the rocks to each other.  Tom Elpel mentioned in his book that one should grout the joints at some later point.  I went to neighboring rock buildings in the area, probably done a hundred years ago by masons who actually knew what they were doing, and they had small joints less than an inch in width.  The only way I could figure to achieve that end was to mash the rocks up very close to each other and then grout over the gaps.  That is probably one way to do it.  Fortunately, that is not the only way, and with hindsight, I do not believe it is the best way.  For our project, as I progressed, I got “looser” with the rocks.  I would leave bigger gaps between them and found that the result, to me, was both more eye-pleasing and much easier to clean.  (more…)

    Slipforming, part 7 – Murphy’s Law, a constant companion

    Friday, September 25th, 2009

    This post follows “Slipforming, part 6 – The latest project.”    For a complete list of links to all slipforming posts on this blog, click here.

    So, we’ve covered that my biggest hurdle was overcoming doubt. Then, everything around me began to die, and then Dad’s added his initial view of the project admitting that he was not proud to confess that the entire work crew consisted of one 73-year-old man and two women in their early 30s (one pregnant, but thankfully not me). Out of this amazing work crew, none had built a home before. What was he thinking? (He was thinking it would last one week. That’s what he was thinking!) Happily for me, disappointingly for my father, I did not quit after one week.

    We had dealt with the ugly reality that we were building a home without a plan – justifying this decision because I’d never built a home before, and didn’t know if it would be one floor or two, mindful of the ever-present possibility that I might beg to quit mid-way through the project. We needed flexibility, and that was solved by just not putting the floor in.

    Photo album house pictures - old 006What would not putting in a floor have to do with it?

    Well, by stubbing the water, gas and electric under the foundation, and leaving them inside, we could run them anywhere we chose. That decision freed me up to continue working on the rock walls while the weather was nice, and during the winter months I could obsess over where everything would go. I am quite aware this is not an ideal situation, nor am I advising it, but it was the only solution that fit our needs. Ken wanted in-floor heat and that decision required a more serious knowledge of the layout, which was dependent on knowing if we could add a second floor. (more…)

    Girls, plastic collars, zip ties and duct tape

    Thursday, September 24th, 2009

    Sixteen-year-old Ben just came home from a 4-H leadership conference in Fort Collins. He had looked forward to it since last year when he met a bunch of friends and found that there is, indeed, life beyond Hotchkiss. Even “girl” life. That was particularly exciting to him. So, when this years sign-up list was making the rounds, Ben’s name was first to hit the roster.

    The event lasted three days, and for some young pups, it was the first time away from home. They frolic, drink Mountain Dew, Red Bull and other caffeine-based drinks, listen to inspiring lecturers and then drive the chaperones crazy until the wee hours. Usually, with a little therapy, the chaperones bounce back to normal within a week. Some remain abnormal the rest of their lives. (You know who you are…)

    Cows 4As is our tradition, all heck broke loose on our end as Ben left. Dad broke his hip; a goat got her leg broke by a dog; another goat got sick and Dad’s cows got a case of the “Happy Feet,” and were running loose apparently heading for a field trip in Montana.

    The photo, at right, shows one of Dad’s cows deep in thought about navigating the most direct route to Montana.  Once the plotting is complete, the cows feet levitate and the rest is a blur of hooves, wringing tails and cow glee. 

    Waiting to pick up Ben from his trip, I got a phone call from the vet saying he had a shot for the sick goat and that we could stop by to pick it up on our way home. Time did not allow me to alert Ben to the change in the usual drive home, so he launched into a full detailed account of the most exciting parts of his trip. That included one story after another involving girls. (more…)

    Slipforming, part 6 – The latest rock project

    Wednesday, September 23rd, 2009

    This post follows “Slipforming, part 5 - Dad’s initial view.”  For a complete list of links to all slipforming posts on this blog, click here.

    Shed photos 007Whenever cement was delivered for sidewalks, or a stairway, it always seems that there was cement left over.  In one case, the cement company had a full yard of extra cement that they would give me, if I could take it.  Of course I would take it, I said.  This meant quickly slapping together forms in a variety of places where cement would not be a regrettable addition.  Consequently, I ended up with an odd extra outbuilding that had cement walls around the exterior up to approximately five foot high.  The walls were ugly, as we were in a hurry to pour the cement and always had the other “original” project, which needed finishing with fresh cement, too.  No problem, I thought, I’ll just cover it with rock later. 

    Well, later has arrived.  This spring, we had MRA Construction put a roof on the building and I am very, very pleased with it.  Milan, the owner, was also my drum instructor in high school, so he knew what to expect and was exceedingly patient as I explained that I wanted a special roof line.  We have double glass doors that view this shed, and I did not want to be looking out at an albatross every time I passed those doors.  The extra curve in the roof adds a whimsical detail that I am thrilled to see.  It was definitely worth the small bit of extra labor and materials. (more…)